Shakira turns the world with a 60 -ton scenario

After canceling their concerts in Chile, scheduled for March 2 and 3, 2025, when the ground where the stage was installed was uneven, Shakira He continued to annul and postpone other concerts along his tour “Women no longer cry” for similar causes, including those who would perform in Medellín, Colombia; and San Antonio, Texas.
This has generated countless speculation about how safe or strong is the scenario that was built exclusively for the multipremized artist, who recently published a photograph on his Instagram account where part of the infrastructure of the broken stage is shown after announcing the cancellation of his show in the Texan city.
The 60 tons structure, which includes giant screens and an inflatable wolf As a centerpiece of the show, which in 15 seconds manages to become a 30 -foot sculpture, was created by the company Yellow Studio and Senior Damun Jawanrudi designer, based in New York.
“(Shakira) described that he wanted a monumental and clean screen where he could project all the messages of his last album,” said Julio Himede, founder of Yellow Studio, Spanish Billboard.
For the creation of the stage, the team worked closely with Shakira, who could cut, assemble and turn the pieces to explore the possibilities, using the general meaning and the general concept of the album for the visuals that appear in the show. In addition to capturing on the tour of the resilience and female empowerment that transmits the homonym album.
“We started about a year ago, in March or April,” said Himede.
“From the beginning, it was a very close collaboration. Shakira was deeply involved in every detail as an artist, being a key visual voice throughout the process,” he said.
Shakira canceled several concerts for structural problems
The Colombian star also postponed for April the concerts that he would offer in February in Medellín, Colombia, after the roof of the stage presenting failures, as well as in San Antonio, Texas, where he could not appear on Friday night due to structural problem.